大型機(jī)器人模型產(chǎn)品的工藝流程:裝箱情況,包裝、運(yùn)輸
Process flow of large robot model products: packing, packaging and transportation
1、采用專用存放架,存放架一般為木質(zhì)或碳鋼支架或墊以橡膠墊,以與碳鋼等其它金屬材質(zhì)隔離。存放時(shí),儲(chǔ)存位置應(yīng)便于吊運(yùn),與其它材料存放區(qū)相對(duì)隔離,有防護(hù)措施,以避免灰塵、油污、鐵銹對(duì)不銹鋼的污染。
1. Special storage racks are used. Generally, the storage racks are wooden or carbon steel supports or rubber pads to isolate them from other metal materials such as carbon steel. During storage, the storage location shall be convenient for lifting, relatively isolated from the storage area of other materials, and protective measures shall be taken to avoid pollution of stainless steel by dust, oil stain and rust.
2、吊裝時(shí),采用專用吊具,嚴(yán)禁使用鋼絲繩以免劃傷表面;在起吊和放置時(shí),避免沖擊磕碰造成劃傷。
2. During hoisting, special lifting tools shall be used, and steel wire rope shall not be used to avoid scratching the surface; When lifting and placing, avoid scratching caused by impact and collision.
3、運(yùn)輸時(shí),應(yīng)用運(yùn)輸工具(如綁帶),潔凈有隔離防護(hù)措施,以防灰塵、油污、鐵銹污染大型機(jī)器人模型。嚴(yán)禁拖拉,避免磕碰、劃傷。
3. During transportation, transportation tools (such as bandages) shall be applied, and clean and isolated protective measures shall be taken to prevent dust, oil stain and rust from polluting the large robot model. Dragging is strictly prohibited to avoid collision and scratch.
大型機(jī)器人模型如何安裝
How to install a large robot model
基礎(chǔ)放樣→基坑開(kāi)挖→墊層施工→基座結(jié)構(gòu)施工→大型機(jī)器人模型安裝→裝飾貼面→清掃(基礎(chǔ)放樣→基坑開(kāi)挖→墊層施工→基座結(jié)構(gòu)施工)由甲方(客戶方)完成,(大型機(jī)器人模型安裝→裝飾貼面→清掃)由乙方(我方)完成。
Foundation setting out → foundation pit excavation → cushion construction → base structure construction → installation of large robot model → decoration and veneering → cleaning (Foundation setting out → foundation pit excavation → cushion construction → base structure construction) shall be completed by Party A (client) (installation of large robot model → decoration and veneering → cleaning) shall be completed by Party B (we).
大型機(jī)器人模型經(jīng)過(guò)設(shè)計(jì)師設(shè)計(jì),身體各個(gè)部分比例協(xié)調(diào),充滿了力量的陽(yáng)剛之美。加工材料選取好的鋼板,經(jīng)過(guò)精心鈑金,細(xì)致焊接后成型,佐以調(diào)色噴漆師傅進(jìn)行色彩的調(diào)配與噴涂,以達(dá)到很好的效果。經(jīng)質(zhì)檢人員檢驗(yàn)合格后出廠。
The large-scale robot model is designed by the designer, and the proportions of all parts of the body are coordinated, which is full of strength and masculine beauty. The steel plate with good processing materials is formed after careful sheet metal and welding, and assisted by professional color mixing and painting masters to coordinate and spray colors, so as to achieve good results. The products shall be delivered after passing the inspection by the quality inspection personnel.
此外與傳統(tǒng)的雕塑和石雕作品相比,大型機(jī)器人模型有著鮮明的特征,大型機(jī)器人不愛(ài)生銹,放的過(guò)程中不需要花很多的時(shí)間進(jìn)行保養(yǎng),同時(shí)也不用擔(dān)心大型機(jī)器人在擺放的過(guò)程中,會(huì)因?yàn)榇髿?、雨水而發(fā)生生銹的現(xiàn)象。
In addition, compared with traditional sculptures and stone carvings, large-scale robot models have distinct characteristics. Large robots do not like to rust, and do not need to spend a lot of time in maintenance during the process of placing. At the same time, there is no need to worry that large robots will rust due to the atmosphere and rain during the process of placing.
我公司擁有的安裝團(tuán)隊(duì),您提供安裝圖紙,我公司可以提供技術(shù)安裝指導(dǎo)。當(dāng)然您的需求以及相關(guān)疑惑都會(huì)得到解答,歡迎來(lái)我們網(wǎng)站